vacuum_maintenance [2011/06/30 14:57] jasonvacuum_maintenance [2020/03/06 09:04] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +== Headline ==
 +A set of very useful [[http://www.normandale.edu/departments/stem-and-education/vacuum-and-thin-film-technology/vacuum-lab/articles/conditioning-vacuum-chambers|articles on vacuum technology, maintenance etc.]]
 Mechanical pumps get oil changes every six months. Mechanical pumps get oil changes every six months.
  
 == Varian Pumping Station == == Varian Pumping Station ==
-^Date ^Name ^Description+^Date ^Name ^Description
 +|10/2013 | CR | Disassembled spectrometer tube and cold cathode gauge.  Both were cleaned and restored to specification.  Both filaments are intact at this time. They are of the thoriated Iridium type. Spectrometer tube was calibrated with a He leak at 10e-6 cc/s and was also retuned to maximize the He signal.| 
 +|12/2011 |    | Roughing pump replaced|
 |06/2011 | JF | Changed oil, cleaned glass, flushed with new oil|  |06/2011 | JF | Changed oil, cleaned glass, flushed with new oil| 
 == Edwards Rough Pump - Thermionics Main Chamber == == Edwards Rough Pump - Thermionics Main Chamber ==
-Fill with PFPE oil only.+:!: Fill with PFPE oil only.
  
-^Date ^Name ^Description+^Date ^Name ^Description
 +|06/2013 | CR/KM | Changed oil| 
 +|07/2012 | RW/CR | Changed oil|
 |06/2011 | JF/CR | Changed oil| |06/2011 | JF/CR | Changed oil|
  
 == Alcatel Rough Pump - Thermionics Load Lock == == Alcatel Rough Pump - Thermionics Load Lock ==
-^Date ^Name ^Description+^Date ^Name ^Description
 +|06/2013 | CR/KM | Changed oil, replaced power plug, not Alcatel pump at this time  | 
 +|07/2012 | RW/CR | Changed oil| 
 +|01/2012 | JF/CR | Changed oil|
 |06/2011 | JF/CR | Changed oil, cleaned inlet filter| |06/2011 | JF/CR | Changed oil, cleaned inlet filter|
  
 == Thermal Evaporator == == Thermal Evaporator ==
-^Date ^Name ^Description+^Date ^Name ^Description
 +|06/2013 | CR/KM | Changed roughing pump oil, replaced power plug | 
 +|07/2012 | RW | Changed dp oil, cleaned glass and vacuum chamber. Fixed leaks in CM water lines. | 
 +|07/2012 | RW/CR | Changed rp oil, cleaned glass | 
 +|12/2011 | JF/CR | Changed rp oil, cleaned glass & inlet filter | 
 +|06/2011 | JF    | Changed rp oil|
  
 == Seebeck Pumping Station == == Seebeck Pumping Station ==
-^Date ^Name ^Description+^Date ^Name ^Description^
 |06/2011 | JF | Changed oil| |06/2011 | JF | Changed oil|
  
 == Optical Cryostat == == Optical Cryostat ==
-^Date ^Name ^Description+^Date ^Name ^Description^

QR Code