Latest News


May 8, 2003

April 25, 2003

           

               

April 23, 2003

As advertised during lecture Monday, April 21 and Wednesday, April 23, The ChemSkill Builder Exercises due 24-Apr are now due 22-May.

April 17, 2003

To better support lecture material, I have decided to change the order of the laboratory exercises for weeks 4 and 5: 

Week 4             Molecular Models

Week 5             LEDs AND Polymers

This summarizes as a swap of the LEDs and Molecular Models labs.

Molecular Models Lab Data Sheet:

1. Model number: 
2. Name the molecular compound or and polyatomic ion: 
3. Chemical formula of the molecular compounds or polyatomic ion: 
4. Molecular and electronic geometries of the molecular compound or polyatomic ion: 
5. Sketch of the molecular compound or polyatomic ion: 
6. Identify functional groups present in molecular compounds if any: 
7. Identify the species as polar or non-polar and identify the direction of the dipole if polar on your sketch:

Hexane:

 

Water:

Midterm Exam Rooms:
Last name begins A-K in Gilbert 124
Last name begins L-Z in Gilbert 224

The CH 122T Grade Sheet (white handout):

CH 122T Grade Sheet      
     
Exam/Quiz/Assignment Date Points Your Score
Exam 1 (Please do not miss) 6:00pm 24-Apr 100  
Exam 2 (Please do not miss) 6:00pm 22-May 100  
Final Exam (You cannot miss!) 6:00pm 10-Jun 150 or 350*  
 
ChemSkill Builder--Chapter 9 Section 5 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 11 Section 1 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 11 Section 2 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 11 Section 4 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 12 Section 1 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 12 Section 2 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 12 Section 4 4pm 24-Apr (70%) 1  
       
ChemSkill Builder--Chapter 12 Section 3 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 12 Section 5 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 13 Section 1 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 13 Section 2 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 13 Section 4 4pm 24-Apr (70%) 1  
ChemSkill Builder--Chapter 14 Section 1 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 14 Section 4 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 14 Section 5 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 14 Section 6 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 15 Section 1 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 15 Section 2 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 15 Section 4 4pm 22-May (70%) 1  
ChemSkill Builder--Chapter 15 Section 5 4pm 22-May (70%) 1  
       
ChemSkill Builder--Chapter 16 Section 1 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 16 Section 2 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 16 Section 3 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 16 Section 5 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 17 Section 1 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 17 Section 2 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 17 Section 3 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 17 Section 4 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 17 Section 5 4pm 6-Jun (70%) 1  
ChemSkill Builder--Chapter 24 Section 1 4pm 6-Jun (70%) 1  
 
No Laboratory Meetings Week 1 -  
Laboratory Assignment A Week 2 -  
Laboratory Assignment 1 Week 3 10  
Laboratory Assignment 2 Week 4 10  
Laboratory Assignment 3a and 3b Week 5 10  
Laboratory Assignment 4 Week 6 10  
Laboratory Assignment 5 Week 7 10  
Laboratory Assignment 6 Week 8 10  
Laboratory Assignment 7 Week 9 10  
Laboratory Assignment B (Must Check-out) Week 10 -  
< Replace your lowest lab assignment score with your next-to-the-lowest laboratory score >     <             >
 
Final Score   450  

 

April 7, 2003

Monday Review (During class on Monday, April 7, this slide will be displayed in lecture for a review discussion).

April 1, 2003

Here's a useful table for ChemSkill Builder or general use! This is a compilation of the electron configurations of the elements up through number 104, broken into three pages (the table was too large for anything less). To arrive at the electron configurations of atoms, you must know the order in which the different sublevels are filled. Electrons enter available sublevels in order of their increasing energy. A sublevel is filled or half-filled before the next sublevel is entered. For example, the s sublevel can only hold two electrons, so the 1s is filled at helium (1s2). The p sublevel can hold six electrons, the d sublevel can hold 10 electrons, and the f sublevel can hold 14 electrons. Common shorthand notation is to refer to the noble gas core, rather than write out the entire configuration. For example, the configuration of magnesium could be written [Ne]3s2, rather than writing out 1s22s22p63s2.

No. Element K L M N O P Q
    1 2 3 4 5 6 7
    s s p s p d s p d  f s p d  f s p d  f s
1 H 1            
2 He 2            
3 Li 2 1          
4 Be 2 2          
5 B 2 2 1          
6 C 2 2 2          
7 N 2 2 3          
8 O 2 2 4          
9 F 2 2 5          
10 Ne 2 2 6          
11 Na 2 2 6 1        
12 Mg 2 2 6 2        
13 Al 2 2 6 2 1        
14 Si 2 2 6 2 2        
15 P 2 2 6 2 3        
16 S 2 2 6 2 4        
17 Cl 2 2 6 2 5        
18 Ar 2 2 6 2 6        
19 K 2 2 6 2 6 -  1      
20 Ca 2 2 6 2 6 -  2      
21 Sc 2 2 6 2 6 1  2      
22 Ti 2 2 6 2 6 2  2      
23 V 2 2 6 2 6 3  2      
24 Cr 2 2 6 2 6 5* 1      
25 Mn 2 2 6 2 6 5 2      
26 Fe 2 2 6 2 6 6 2      
27 Co 2 2 6 2 6 7 2      
28 Ni 2 2 6 2 6 8 2      
29 Cu 2 2 6 2 6 10 1*      
30 Zn 2 2 6 2 6 10 2      
31 Ga 2 2 6 2 6 10 2 1      
32 Ge 2 2 6 2 6 10 2 2      
33 As 2 2 6 2 6 10 2 3      
34 Se 2 2 6 2 6 10 2 4      
35 Br 2 2 6 2 6 10 2 5      
36 Kr 2 2 6 2 6 10 2 6      

 
No. Element K L M N O P Q
    1 2 3 4 5 6 7
    s s p s p d s p d  f s p d  f s p d  f s
37 Rb 2 2 6 2 6 10 2 6 - 1    
38 Sr 2 2 6 2 6 10 2 6 - 2    
39 Y 2 2 6 2 6 10 2 6 1 2    
40 Zr 2 2 6 2 6 10 2 6 2 2    
41 Nb 2 2 6 2 6 10 2 6 4* 1    
42 Mo 2 2 6 2 6 10 2 6 5 1    
43 Tc 2 2 6 2 6 10 2 6 6 1    
44 Ru 2 2 6 2 6 10 2 6 7 1    
45 Rh 2 2 6 2 6 10 2 6 8 1    
46 Pd 2 2 6 2 6 10 2 6 10 0*    
47 Ag 2 2 6 2 6 10 2 6 10 1    
48 Cd 2 2 6 2 6 10 2 6 10 2    
49 In 2 2 6 2 6 10 2 6 10 2 1    
50 Sn 2 2 6 2 6 10 2 6 10 2 2    
51 Sb 2 2 6 2 6 10 2 6 10 2 3    
52 Te 2 2 6 2 6 10 2 6 10 2 4    
53 I 2 2 6 2 6 10 2 6 10 2 5    
54 Xe 2 2 6 2 6 10 2 6 10 2 6    
55 Cs 2 2 6 2 6 10 2 6 10 2 6 -  - 1  
56 Ba 2 2 6 2 6 10 2 6 10 2 6 -  - 2  
57 La 2 2 6 2 6 10 2 6 10 - 2 6 1  - 2  
58 Ce 2 2 6 2 6 10 2 6 10 2* 2 6 -  - 2  
59 Pr 2 2 6 2 6 10 2 6 10 3 2 6 -  - 2  
60 Nd 2 2 6 2 6 10 2 6 10 4 2 6 -  - 2  
61 Pm 2 2 6 2 6 10 2 6 10 5 2 6 -  - 2  
62 Sm 2 2 6 2 6 10 2 6 10 6 2 6 -  - 2  
63 Eu 2 2 6 2 6 10 2 6 10 7 2 6 -  - 2  
64 Gd 2 2 6 2 6 10 2 6 10 7 2 6 1  - 2  
65 Tb 2 2 6 2 6 10 2 6 10 9* 2 6 -  - 2  
66 Dy 2 2 6 2 6 10 2 6 10 10 2 6 -  - 2  
67 Ho 2 2 6 2 6 10 2 6 10 11 2 6 -  - 2  
68 Er 2 2 6 2 6 10 2 6 10 12 2 6 -  - 2  
69 Tm 2 2 6 2 6 10 2 6 10 13 2 6 -  - 2  
70 Yb 2 2 6 2 6 10 2 6 10 14 2 6 -  - 2  

 
No. Element K L M N O P Q
    1 2 3 4 5 6 7
    s s p s p d s p d  f s p d  f s p d  f s
71 Lu 2 2 6 2 6 10 2 6 10 14 2 6 1  -  2  
72 Hf 2 2 6 2 6 10 2 6 10 14 2 6 2  -  2  
73 Ta 2 2 6 2 6 10 2 6 10 14 2 6 3  -  2  
74 W 2 2 6 2 6 10 2 6 10 14 2 6 4  -  2  
75 Re 2 2 6 2 6 10 2 6 10 14 2 6 5  -  2  
76 Os 2 2 6 2 6 10 2 6 10 14 2 6 6  -  2  
77 Ir 2 2 6 2 6 10 2 6 10 14 2 6 7  -  2  
78 Pt 2 2 6 2 6 10 2 6 10 14 2 6 9  -  1  
79 Au 2 2 6 2 6 10 2 6 10 14 2 6 10 - 1  
80 Hg 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2  
81 Tl 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 1 -  -  
82 Pb 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 2 -  -  
83 Bi 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 3 -  -  
84 Po 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 4 -  -  
85 At 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 5 -  -  
86 Rn 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 6 -  -  
87 Fr 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 6 -  - 1
88 Ra 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 6 -  - 2
89 Ac 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 6 1  - 2
90 Th 2 2 6 2 6 10 2 6 10 14 2 6 10 - 2 6 2  - 2
91 Pa 2 2 6 2 6 10 2 6 10 14 2 6 10 2* 2 6 1  - 2
92 U 2 2 6 2 6 10 2 6 10 14 2 6 10 3  2 6 1  - 2
93 Np 2 2 6 2 6 10 2 6 10 14 2 6 10 4  2 6 1  - 2
94 Pu 2 2 6 2 6 10 2 6 10 14 2 6 10 6  2 6 -  - 2
95 Am 2 2 6 2 6 10 2 6 10 14 2 6 10 7  2 6 -  - 2
96 Cm 2 2 6 2 6 10 2 6 10 14 2 6 10 7  2 6 1  - 2
97 Bk 2 2 6 2 6 10 2 6 10 14 2 6 10 9* 2 6 -  - 2
98 Cf 2 2 6 2 6 10 2 6 10 14 2 6 10 10 2 6 -  - 2
99 Es 2 2 6 2 6 10 2 6 10 14 2 6 10 11 2 6 -  - 2
100 Fm 2 2 6 2 6 10 2 6 10 14 2 6 10 12 2 6 -  - 2
101 Md 2 2 6 2 6 10 2 6 10 14 2 6 10 13 2 6 -  - 2
102 No 2 2 6 2 6 10 2 6 10 14 2 6 10 14 2 6 -  - 2
103 Lr 2 2 6 2 6 10 2 6 10 14 2 6 10 14 2 6 1  - 2
104 Rf 2 2 6 2 6 10 2 6 10 14 2 6 10 14 2 6 2  - 2

*Note Irregularity

March 31, 2003

Opportunity:
There is a student in our CH 122T class who needs a copy of the class notes.  The pay for providing notes is $136.00 for a 4 credit hour course.  If you have a 2.5 GPA, take accurate and legible notes, please see the receptionist in the Services for Students with Disabilities Office, 200 Kerr Administration Building, to sign up and to receive further instructions regarding the SSD program.  If you have any questions, please do not hesitate to call at 737-8582.

March 31, 2003

To change your ChemSkill Builder registration to CH 122T:

1.    Login to ChemSkill Builder.

2.    Select "Account Information" from the left column (depicted below).

3.    Change the instructor to "Nafshun, Richard" (depicted below).  The Course entry is "122T" and the section number is "001"  

4.    Click on "Credit Mode."

5.    As instructed, login again to confirm correct registration (Course: 122T; Section: 001; Instructor: Nafshun).

Pre-March 31, 2003

Current announcements will be made here during the term.