head.gif (2171 bytes)
Previous Next
Attach the filling connection from the compressed oxygen cylinder to the vessel head.  Slowly pressurize the bomb to 30 atmospheres (should take about 5 min).  The gaskets are self-seating under pressure, so the system may leak until you get a little pressure built up.

                                                 


Back to CH362 Home Page