Tate Lab Wiki

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
pld:start [2016/04/14 10:14] jamespld:start [2020/03/06 09:04] (current) – external edit 127.0.0.1
Line 9: Line 9:
  
 {{:pld:thermionics_chamber_20150422.png|}} {{:pld:thermionics_chamber_20150422.png|}}
 +
 +{{PLD_process_schematic-ours.png|}}
  
 ==== Load Lock ==== ==== Load Lock ====
Line 46: Line 48:
 //Thermionics chamber//: The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. However, the gate valve to the main chamber will be automatically closed, which will prevent the chamber from venting to atmospheric pressure immediately. With the gate valve closed, the pressure should stay in the 10<sup>-7</sup> Torr range and very slowly increase until the system is reset. //Thermionics chamber//: The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. However, the gate valve to the main chamber will be automatically closed, which will prevent the chamber from venting to atmospheric pressure immediately. With the gate valve closed, the pressure should stay in the 10<sup>-7</sup> Torr range and very slowly increase until the system is reset.
  
-If you discover that the power has gone out, make sure that the gate valve has closed (by the red indicator light if the power has been restored, or the white spot on the indicator beneath the gate valve motor is on closed). If the valve is closed, you can use {{:pld:reset_pld_thermionics2015.pdf|these instructions}} to restore the system.  If the pressure is higher than 10<sup>-3</sup> or if the gate valve does not appear to have closed, then follow the Pump Down Procedures in the instructions (toggle switch up on silver panel, reset buttons on black panels, wait for the pressure to drop below 10<sup>-3</sup> Torr range, then restart Turbo Pumps). Here is a schematic for reference.{{:pld:control_tower.gif|}}+If you discover that the power has gone out, make sure that the gate valve has closed (by the red indicator light if the power has been restored, or the white spot on the indicator beneath the gate valve motor is on closed). If the valve is closed, you can use {{:pld:reset_pld_thermionics_2016.pdf|these instructions}} to restore the system.  If the pressure is higher than 10<sup>-3</sup> or if the gate valve does not appear to have closed, then follow the Pump Down Procedures in the instructions (toggle switch up on silver panel, reset buttons on black panels, wait for the pressure to drop below 10<sup>-3</sup> Torr range, then restart Turbo Pumps). Here is a schematic for reference.{{:pld:control_tower.gif|}}
  
  
Line 72: Line 74:
 There are many windows on the thermionics chamber.  However, there are two UV grade laser windows.  Each of these is mounted in a ConFlat flange.  Each of the laser windows is made of [[http://marketplace.idexop.com/store/SupportDocuments/MaterialProperties.pdf|fused silica]], and measuring with the Coherent power meter, have a loss of approximately 10% at 248nm. There are many windows on the thermionics chamber.  However, there are two UV grade laser windows.  Each of these is mounted in a ConFlat flange.  Each of the laser windows is made of [[http://marketplace.idexop.com/store/SupportDocuments/MaterialProperties.pdf|fused silica]], and measuring with the Coherent power meter, have a loss of approximately 10% at 248nm.
  
-===== Procedure ===== +===== Standard Operating Procedure ===== 
-{{:pld:pld_procedure.tex.pdf|Thermionics Chamber}} - Josh Russell+{{:pld:pld_procedure.tex.pdf|Thermionics Chamber}}
  
-{{:pld:neocera.pld.instructions.pdf|Neocera Chamber}}+{{:pld:neocera_chamber_sop.pdf|Neocera Chamber}} 
 + 
 +{{:pld:laser_sop-tate_lab.doc|Laser Operation}}
  
 {{:pld:gas_change_20150416.pdf|Laser Gas Change}} {{:pld:gas_change_20150416.pdf|Laser Gas Change}}
  
 {{:pld:PLD_viewing_window_cleaning_20150422.pdf|Chamber Window Cleaning}} {{:pld:PLD_viewing_window_cleaning_20150422.pdf|Chamber Window Cleaning}}
- 
- 
-FIXME 
-Chamber cleaning procedures 
  
 ===== Routine Maintenance ===== ===== Routine Maintenance =====
Line 94: Line 94:
 heating heating
  
-{{:pld:compex_0300_user_manual_.pdf|ComPex 201 excimer laser manual}}+ComPex 201 excimer laser manual has been taken off-line 
  
-{{:pld:siteprepcomp_1299.pdf|Site Prep documentaion}} for ComPex 205+{{:pld:siteprepcomp_1299.pdf|Site Prep documentaion}} for ComPex 201
  
  
Line 104: Line 104:
 ==Changing Gas== ==Changing Gas==
 Process Tube {{:pld:os01000-001s_layout1_1_.pdf|gas cabinet layout}} Process Tube {{:pld:os01000-001s_layout1_1_.pdf|gas cabinet layout}}
-The premixed gas we use is: 0.1% F2, 1.7% He, 3.93% Kr, balance Ne (i.e. rest is Neon).+The premixed gas we use is: 0.1% F2, 1.7% He, 3.93% Kr, balance Ne (i.e. rest is Neon), and the SDS is {{:pld:krf_premix_spectra.pdf|KrF premix SDS}} 
 + 
 +Usually purchased from Airgas, contact can be found by following the [[:Purchasing|Purchasing]] link 
 + 
 +==Cleaning/polishing Targets and Substrate Holders== 
 + 
 +The process we use for cleaning targets/substrate holders includes a series of increasing grit sand paper.  The grit sizes range from 200 to 2000 and depending on the density of the material we may start at a smaller or larger grit.  For example a soft ceramic target will most likely require you to start with a higher grit (say 800 or 1000) while polishing the substrate holders may require a much lower grit (say 200 or 400) to remove as much of the deposited material as possible.  One thing to keep in mind when polishing targets/substrate holders is that the type of material you are polishing may be toxic.  A list of toxic metals which need to be disposed of through EH&S is posted on the fume hood and can also be found {{:pld:hazardous_heavy_metals.docx|here}}. 
 + 
 +==Cleaning Chamber == 
 +Advice from Hiroshi Yanagi (Yamanashi) about cleaning a sulfide chamber (2017). "We use H2O2 for cleaning vacuum chamber, but only when it is terrible. Usually, acetone and alcohol is enough. When you use H2O2 or cleanser, clean up with water, acetone and alcohol. Then bake the chamber. For window cleaning, we used abrasive cleanser for bright polishing of metal surface (not for dish cleaning.)" 
  
-Usually purchased from Airgas, contact can be found here [[:Purchasing|Purchasing]] 
  
  

QR Code
QR Code pld:start (generated for current page)