Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
pld:start [2015/02/10 22:33] – james | pld:start [2015/08/26 12:26] – james | ||
---|---|---|---|
Line 8: | Line 8: | ||
The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | ||
- | {{:pld:pld_thermionics_system.gif|}} FIXME - make this smaller | + | {{:pld:thermionics_chamber_20150422.png|}} |
==== Load Lock ==== | ==== Load Lock ==== | ||
Line 70: | Line 70: | ||
==== Windows ==== | ==== Windows ==== | ||
- | There are many windows on the thermionics chamber. | + | There are many windows on the thermionics chamber. |
===== Procedure ===== | ===== Procedure ===== | ||
Line 77: | Line 77: | ||
{{: | {{: | ||
- | {{:pld:gas_change_20120606.pdf|Laser Gas Change}} | + | {{:pld:gas_change_20150416.pdf|Laser Gas Change}} |
+ | |||
+ | {{: | ||
FIXME | FIXME | ||
- | Chamber | + | Chamber cleaning procedures |
===== Routine Maintenance ===== | ===== Routine Maintenance ===== | ||
Line 99: | Line 102: | ||
{{: | {{: | ||
+ | ===== Service ===== | ||
+ | [[https:// | ||
+ | email is the best way to contact Frank, frank-cipolla@oni-corp.com |