Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
pld:start [2012/02/14 16:40] – jason | pld:start [2014/02/10 12:31] – janet | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Pulsed Laser Deposition ====== | ====== Pulsed Laser Deposition ====== | ||
The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers. | The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers. | ||
- | ===== Vacuum Systems===== | + | |
- | ==== Thermionics Chamber ==== | + | A log of important modifications to the system can be found [[pld: |
+ | |||
+ | ===== Thermionics Chamber | ||
The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | ||
Line 27: | Line 30: | ||
The BOC Edwards Turbo pump is an amazing, maintenance-free, | The BOC Edwards Turbo pump is an amazing, maintenance-free, | ||
- | ====Power Outages==== | + | ==== Substrate heating ==== |
+ | FIXME Chris | ||
+ | |||
+ | ===== Neocera Chamber ===== | ||
+ | FIXME | ||
+ | ==== Substrate heating ==== | ||
+ | FIXME | ||
+ | =====Power Outages===== | ||
The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. | The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. | ||
Line 52: | Line 62: | ||
==== Windows ==== | ==== Windows ==== | ||
- | There are many windows on the thermionics chamber. | + | There are many windows on the thermionics chamber. |
===== Procedure ===== | ===== Procedure ===== | ||
Line 59: | Line 69: | ||
{{: | {{: | ||
- | {{:pld:gas_change.pdf|Laser Gas Change}} | + | {{:pld:gas_change_20120606.pdf|Laser Gas Change}} |
===== Routine Maintenance ===== | ===== Routine Maintenance ===== | ||
+ | The maintenance schedule for the PLD lab is located [[pld: | ||
+ | |||
FIXME | FIXME | ||
Vacuum inside of laser cabinet (monthly) | Vacuum inside of laser cabinet (monthly) |