Tate Lab Wiki

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
pld:start [2012/02/14 16:40] jasonpld:start [2014/02/10 12:29] janet
Line 1: Line 1:
 ====== Pulsed Laser Deposition ====== ====== Pulsed Laser Deposition ======
 The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers.  It is located in Weniger 475.  [[safety:start|Safety]] procedures must be observed at all times. The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers.  It is located in Weniger 475.  [[safety:start|Safety]] procedures must be observed at all times.
-===== Vacuum Systems===== + 
-==== Thermionics Chamber ====+A log of important modifications to the system can be found [[pld:changelog|here]].  If you want to know why something is the way it is, start here. 
 + 
 +===== Thermionics Chamber ===== 
 The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock.  The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections.  The load lock and the main chamber are each served by two vacuum pumps, a turbo-molecular pump and a roughing pump working in series. The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock.  The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections.  The load lock and the main chamber are each served by two vacuum pumps, a turbo-molecular pump and a roughing pump working in series.
  
Line 27: Line 30:
 The BOC Edwards Turbo pump is an amazing, maintenance-free, wonder pump.  This pump has a low pressure limit of 10^-9 Torr, and has magnetic bearings so that there is no hydrocarbon grease vaporizing into the chamber.  If the turbine were to suffer an unbalanced build up of matter on it, changing its moment of inertia, the controller will modify the bearing properties along 5 axes (3 translational, 2 angular) such that the turbine always rotates about its center of mass in a balanced way.  When the entire system is clean, this pump easily matches it's operating pressure specs, and at times surpasses them. The BOC Edwards Turbo pump is an amazing, maintenance-free, wonder pump.  This pump has a low pressure limit of 10^-9 Torr, and has magnetic bearings so that there is no hydrocarbon grease vaporizing into the chamber.  If the turbine were to suffer an unbalanced build up of matter on it, changing its moment of inertia, the controller will modify the bearing properties along 5 axes (3 translational, 2 angular) such that the turbine always rotates about its center of mass in a balanced way.  When the entire system is clean, this pump easily matches it's operating pressure specs, and at times surpasses them.
  
 +==== Substrate heating ====
 +
 +===== Neocera Chamber =====
 +FIXME
 +==== Substrate heating ====
 +FIXME
 ====Power Outages==== ====Power Outages====
 The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored.
Line 52: Line 61:
  
 ==== Windows ==== ==== Windows ====
-There are many windows on the thermionics chamber.  However, there are two UV grade laser windows.  Each of these is mounted in a ConFlat flange.  Each of the laser windows is made of fused silica, and measuring with the Coherent power meter, have a loss of approximately 10%.+There are many windows on the thermionics chamber.  However, there are two UV grade laser windows.  Each of these is mounted in a ConFlat flange.  Each of the laser windows is made of fused silica, and measuring with the Coherent power meter, have a loss of approximately 10% at 248nm.
  
 ===== Procedure ===== ===== Procedure =====
Line 59: Line 68:
 {{:pld:neocera.pld.instructions.pdf|Neocera Chamber}} {{:pld:neocera.pld.instructions.pdf|Neocera Chamber}}
  
-{{:pld:gas_change.pdf|Laser Gas Change}}+{{:pld:gas_change_20120606.pdf|Laser Gas Change}}
  
 ===== Routine Maintenance ===== ===== Routine Maintenance =====
 +The maintenance schedule for the PLD lab is located [[pld:maint_sched|here]].
 +
 FIXME FIXME
 Vacuum inside of laser cabinet (monthly) Vacuum inside of laser cabinet (monthly)

QR Code
QR Code pld:start (generated for current page)