====== Pulsed Laser Deposition ====== | ====== Pulsed Laser Deposition ====== | ||
The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers. | The PLD system comprises a ComPex 205 248-nm excimer laser plus optical elements and two vacuum chambers. | ||
- | ===== Vacuum Systems===== | + | |
- | ==== Thermionics Chamber ==== | + | A log of important modifications to the system can be found [[pld: |
+ | |||
+ | ===== Thermionics Chamber | ||
The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | The Thermionics chamber consists of two joined vacuum chambers, the main chamber and the load lock. The main chamber and the load lock are separated by a large gate valve which serves to isolate the two sections. | ||
Line 27: | Line 30: | ||
The BOC Edwards Turbo pump is an amazing, maintenance-free, | The BOC Edwards Turbo pump is an amazing, maintenance-free, | ||
- | ====Power Outages==== | + | ==== Substrate heating ==== |
+ | FIXME Chris | ||
+ | |||
+ | ===== Neocera Chamber ===== | ||
+ | FIXME | ||
+ | ==== Substrate heating ==== | ||
+ | FIXME | ||
+ | =====Power Outages===== | ||
The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. | The Thermionics chamber is set up so that in event of a power failure, the valves between the roughing and turbo pumps will remain closed and the pumps will not turn back on when power is restored. | ||
Line 52: | Line 62: | ||
==== Windows ==== | ==== Windows ==== | ||
- | There are many windows on the thermionics chamber. | + | There are many windows on the thermionics chamber. |
===== Procedure ===== | ===== Procedure ===== | ||
- | Procedure in place in 2009: {{: | + | {{: |
+ | |||
+ | {{: | ||
+ | |||
+ | {{: | ||
===== Routine Maintenance ===== | ===== Routine Maintenance ===== | ||
+ | The maintenance schedule for the PLD lab is located [[pld: | ||
+ | |||
FIXME | FIXME | ||
+ | Vacuum inside of laser cabinet (monthly) | ||
Clean windows (how often) | Clean windows (how often) | ||
Check on the sample holder screw (which one?) | Check on the sample holder screw (which one?) |